Bispebjerg Hospital has just constructed a new building that will serve as a gas depot. The building is built on BAYO.S ground screws. In a densely built-up area like Bispebjerg Hospital, it is crucial to minimise excavations and avoid disturbing the surrounding environment. With BAYO.S ground screws, the foundation could be installed through the existing ground down to the load-bearing base. In this project, the 64 screws were installed at a depth of 1.25 – 6 metres. The new building integrates harmoniously with the existing hospital facilities and contributes to a cohesive and aesthetic whole.